Crescent Point Energy Trust


  • Total Capital Cost around >$40,000,000 Grey Owl Cost at around $4,000,000.
  • Oil Facilities

    5000 m3/DAY SOUR OIL BATTERY

    • Engineering, procurement and construction management services for sour oil battery that included inlet header, inlet separator, FWKO, treater, sour gas compression, (6) 2000 bbl tanks, water injection, transfer pumps, utilities and licensing with local regulatory board/commission.

    1000 m3/DAY SOUR OIL BATTERY

    • Engineering, procurement and construction management services for sour oil battery that included inlet header, inlet separator, treater, sour gas compression, (6) 2000 bbl tanks, water injection, Elec./Inst. design transfer pumps, utilities and licensing with local regulatory board/commission.
  • Pipeline gathering System, Multi-Well program, Single well batteries and Water Injection project.

    British Columbia and Saskatchewan

    • Between 2008/2009 Grey Owl completed over 500 sour Oil well tie-ins and associated facilities and pipelines, totaling over 100 km of fiberglass pipelines ranging from 3" to 12", Battery upgrades, Gathering system, Water Injection projects, Elec./Inst. design and licensing with local regulatory board/commission, Construction management and more.